KitLog pro

Powered By Kitlog Pro v2.0

My RV-8 build
' style=
Date:  7-23-2012
Number of Hours:  1.50
Manual Reference:  Page 7-11
Brief Description:  Flaps #2

After the 706B was in place, the 706A was measured, drilled for the 5 holes (not including the rib holes) clamped and then drilled to the spar and the 706B. Once in place, the skins were removed and the 3 rib holes were drilled.

After all of the pieces were in place, including the spacers for the outside ribs and the top skin, the entire left flap was final drilled and then prepped for the hinge drilling.
' style=

FL 706A dimensions added

FL 706A dimensions added

' style=

FL 706A drilled and in place

FL 706A drilled and in place

' style=

Prepping for the hinge

Prepping for the hinge

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.